R&D (FilterCavity)
DaisukeTatsumi - 17:35, Wednesday 11 November 2015 (200)
Preparations for TAMA SAS system removal

On 11 November, we finished the following works.

 
[Workers] Eleonora, Ishizaki, Tatsumi
[WORKERS] Eleonora, Ishizaki, and Tatsumi

1)  fixing the TAMA SAS system,

2)  unscrewing TAMA SAS system from the bottom of the vacuum tank. and

3)  we found a hanging frame for TAMA SAS system at TAMA west-end room.

      Ishizaki-san will move it to TAMA center room.

4)  a double-pendulum system and bottom plate of the stack isolator

      were moved from warehouse to TAMA center room.

Now TAMA SAS system is ready to remove.

Non-image files attached to this report