On 11 November, we finished the following works.
1) fixing the TAMA SAS system,
2) unscrewing TAMA SAS system from the bottom of the vacuum tank. and
3) we found a hanging frame for TAMA SAS system at TAMA west-end room.
Ishizaki-san will move it to TAMA center room.
4) a double-pendulum system and bottom plate of the stack isolator
were moved from warehouse to TAMA center room.
Now TAMA SAS system is ready to remove.