Takahashi, Yuhang, Eleonora
We replaced the TMP near NM2 from TMC1000MC (broken) to STP-1003 (new).
-
Removed the screws for the ICF253 flange. Dismounted the old TMP.
-
Mounted the new TMP. Set the rotational direction of exhaust to 225deg. Fastened the screws for the ICF253 flange. Final torque was 250kgf/cm.
-
Connected the dry pump (DSP250). Started the dry pump. Opened the angle valve.
-
Turned on the controller. It showed a fail due to different combination between the TMP and the controller. Reset the controller, then the controller went to auto tuning.
-
Started the TMP. The TMP went to normal operation.
-
After monitoring for two hours, opened gate valves to the 300-m pipe. The pressure became 4x10-7mbar.