R&D (FilterCavity)
YuhangZhao - 16:36, Wednesday 17 March 2021 (2404)
Filter cavity alignment recovered after earthquake

Marc and Yuhang

After moving picomotors, filter cavity alignment was recovered.

Spectrum of all mirrors were checked as the attached figure. No touching induced peaks were found.

Images attached to this report
2404_20210317083626_20210317specall.png