Tatsumi and Takahashi successfully installed the mirror into PR vacuum tank.
Also one additional optical window was installed for Optical Lever system.
Instead of that, a turbo pump was removed from the port.
ToDo list:
* In-vacuum coil actuator cables are temporary connected to the panel fixed at the suspension frame.
We should check the connection later.