[WORKERS] Tatsumi, Takahashi, Manuel, Eleonora
(1) At TAMA south end room (EM2 tank)
* Install four coils.
* Connect in-vacuum cables for the coil
Manual checked the cable connections. He will report soon.
(2) At TAMA center room (BS tank)
* Open the BS tank
* Remove the suspension with BS mirror
* Close the tank
Tatsumi will glue magnets on BS mirror in the next week.
And then we will install the mirror to the BS tank.
[Manuel, Tatsumi]
We checked the wire connections for the coils. The pictures show the order of the wire connections on the suspension, and outside the tank.