We have done some more check before opening the BS vacuum chamber.
1. Check BS P and Y transfer functions. They are similar with reference as shows in the fig1 and fig2.
2. Check coupling between P and Y. A substantial coupling increase is found as shows in the fig3.
3. We tried to close BS local control loop. But failed.
The results of test 2 and 3 make us really need to open BS chamber to check. The opening work is scheduled to be in this afternoon.