[Marc, Michael, Shalika]
We reconnected all electronics of DDS1 and 2.
We are preparing a summary document that we will upload to the wiki.
We restarted the various rack electronics and laser and could directly see green flashes.
We changed the DDS1 DAC 0 and 1 frequency to 88 MHz for the SHG lock.
We could relock SHG but reflected green power seems too low (~10mW while it was ~240mW before in elog 3091).
We will install a power meter in transmission of SHG to check mode-matching.
Also, it seems that we might have some clipping (maybe at green FI) that needs to be investigated.