R&D (General)
YuefanGuo - 17:00, Tuesday 13 December 2016 (347)
Optical scheme changed
We finished the alignment of the beam, kept the reflection beam and transmission beam at almost the same height as the input(76cm) and got the green. According to the new optical scheme, we need to change to a different kind of dichroic mirror(reflect infrared and transmit green), which we don't have in lab now. And also the present transfer stage we are using for SHG housing take too much space. If we do not change it, it will be hard to realize the new optical scheme. In the attachment, I put the picture of the stage.
Images attached to this report
347_20161213085113_pc130168.jpg