General (General)
ManuelMarchio - 19:38, Thursday 19 January 2017 (357)
Clean up some multiple sockets

I tidied up the power supply of the absorption measurement system because it was too messy. There were a lot of unnecessary multiple sockets connected in series (which is bad for the electrical grounding), especially under the stairs (all covered by dust). So, I rearranged the multiple sockets and put the unneeded ones on a shelf in the first floor, see the picture.

Images attached to this report
357_20170119113726_sockets.png