I will set up blackout curtain near the cryostat optical table to section off the back side of ATC lab (figure-1). The plan is to move the long Al bar closer to the AC unit and hang the curtain on the entire length of the rod (figure-2). I measured various dimensions for this work.
During this work, I noticed the items on the optical table were moved. If you move stuff on the table, an email or verbal confrimation would be appericated.
Hirata gave me some drill bits yesterday. Unfortuantely. these drill bits are too small. If I can't find one in ATC I will order them online. If some has HEX5 bits for Makita drill, similar to the bit in the attached picture please let me know.