General (General)
MichaelPage - 23:05, Friday 08 November 2024 (3821)
ATC electrical shutdown

In preparation for NAOJ blackout I completely shutdown all equipment in the ATC ISO Class 1 booth

Air conditioner, lightwave PSU, coherent PSU, SHG temperature controller, OPO temperature controller, homodyne PSU, PZT driver, Anritsu function generator, OPO translation driver, topgun

Then I disconnected all wall plugs for cleanroom equipment

Koach was already off