In preparation for NAOJ blackout I completely shutdown all equipment in the ATC ISO Class 1 booth
Air conditioner, lightwave PSU, coherent PSU, SHG temperature controller, OPO temperature controller, homodyne PSU, PZT driver, Anritsu function generator, OPO translation driver, topgun
Then I disconnected all wall plugs for cleanroom equipment
Koach was already off