R&D (FilterCavity)
RyutaroTakahashi - 10:10, Monday 13 March 2017 (409)
Vent of the MC line
The MC line (MC1, MC2, and 10m tube) was vented on the 3rd in March.
- The pressure was 1.2 Torr before vent.
- The GV in the mid point is opened.
- The TMP and the Drypump can work.