R&D (FilterCavity)
EleonoraCapocasa - 22:13, Tuesday 14 March 2017 (410)
Picomotors check for suspension in PR chamber

Today we checked the picomotors of the suspension in the PR chamber (a part of the filter cavity telescope).

The suspesion is equipped with 5 picomotors and 2 piezo.

Starting from the top (see attached picture):

1° stage:  

2° stage:

3° stage:

In order to control the picomotor we have used as out-of vacuum cable the original cable used for the double pendulum suspension in NM1.

Pinout: http://tamago.mtk.nao.ac.jp/tama/ifo/www_suspension_install_status/burndy.jpg (we are not sure that our definitions of X, Y, Z agree with that reported in this link)

There are two cables (with 6 pins) coming out from the connector, repectively named EF ALIGNMENT and EF LENGTH. We have connected them to the picomotor driver and checked the degree of freedom controlled by each of them.

NB: each cable can move 3 picomotors, which using the hand-pad convention are named A, B, C.

Here what we found:

EF ALIGNEMENT

EF LENGTH

We checked that all the picomotors work in both directions.

Images attached to this report
410_20170315030721_picomotors.png