Work in the KAGRA site.
Member: Takahashi, Ohishi, Ishizaki, Barton, Doi
[April 23 AM]
- Measured particles (4-10/L@1F, 29/L@2F).
- Removed lapping for the chamber.
- Wiped the floors by a mop.
- Wiped the chamber by wet cloth.
- Measured particles (2-4/L@1F, 11/L@2F)