Warning: Undefined variable $s in /var/www/public_html/osl/classes/DAO.php on line 959
NAOJ GW Elog Logbook
LOG-IN
Displaying report 1-1 of 1.
KAGRA MIF (General)
Print this report.
YoichiAso - 16:20, Tuesday 14 July 2015 (129)Get code to link to this report
Preparing the instrument control racks for placing in the mine

At some point, we have to put the instrument control system racks in the humid environment of the tunnel.
I borrowed a plastic cover from DGS and put it on one of the racks. Then I turned on the system. I also put a temperature meter.
I will leave it like this until tomorrow to see if the temperature goes up high enough (above 30C).

If the temperature is high, we can expect the local humidity to drop accordingly. So we can move the rack to the field.

Right now, the wrapped rack is sitting in front of the shutter.


 

Images attached to this report
129_20150714091922_20150714132718.jpg
Comments related to this report
YoichiAso - 06:05, Thursday 16 July 2015 (130)

I checked the temperature inside the rack after about 24 hours. It was 23.9C. The temperature raise is too small. I will look for a way to generate more heat (heater) in a controlled way (slidac ?).