LOG-IN
Displaying reports 921-940 of 3274.Go to page Start 43 44 45 46 47 48 49 50 51 End
KAGRA MIR (Polarization)
Print this report.
MarcEisenmann - 15:41, Wednesday 17 November 2021 (2738)Get code to link to this report
AZTEC sample birefringence not rotated

Using the new code (cross-checked with Shinkosha 7 results)

Remember that here DC corresponds to s pol and DC gain should be 10.

Images attached to this report
2738_20211117074107_pol0deg.png 2738_20211117074110_pol30deg.png 2738_20211117074114_pol60deg.png 2738_20211117074117_pol75deg.png 2738_20211117074121_s0.png 2738_20211117074125_s1.png 2738_20211117074128_meandntheta.png 2738_20211117074131_deltan.png 2738_20211117074134_theta.png
R&D (FilterCavity)
Print this report.
MarcEisenmann - 17:32, Monday 15 November 2021 (2737)Get code to link to this report
OpLev optics height

The height of the first steering mirror and PSD is 110 mm for BS and Input and 115mm for PR.

For End, the height of the first steering mirror is 110 mm while the PSD height is 90 mm (maybe a reason for the strange behavior of this oplev?).

I'll try to tune it after the FC recovery (we had a black-out on Saturday).

I also fixed the ND filter of the BS oplev that was not fixed.

R&D (FilterCavity)
Print this report.
MichaelPage - 14:15, Monday 15 November 2021 (2736)Get code to link to this report
Comment to In-vacuum Faraday measurement (Click here to view original report: 2727)

I only just remembered this but we also measured the beam height (70mm) before and after the Faraday assembly, as shown in the photos.

Images attached to this comment
2736_20211115061451_prbeamheightbefore.png 2736_20211115061455_prbeamheightafter.jpg
R&D (FilterCavity)
Print this report.
YuhangZhao - 13:47, Monday 15 November 2021 (2735)Get code to link to this report
Turbo pump issue after blackout recovery in TAMA

We had blackout on 20211113. Today, we recovered facilities in TAMA and found one of the turbo pumps got error.

To recover vacuum system, I firstly turned on rotary/dry pump and wait for a few minutes and open the gate valve between rotary/dry pump and turbo pump. Then I turned on turbo pump.

The error happened only for the turbo pump in the middle of arm. And it happened few minutes after I switched it on. The large noise was heard from it. The error code is E089 shown on the screen of turbo pump controller.

I checked online, the E089 indicates that rotor is outside its nominal position.

KAGRA MIR (Polarization)
Print this report.
SimonZeidler - 16:57, Wednesday 10 November 2021 (2733)Get code to link to this report
Comment to TAMA 1 (Shinkosha) birefringence measurement (Click here to view original report: 2731)

That looks very good, indeed!
What you can do in addition is to check for the second (negative) solution according to theory, as I reported last meeting.

An important point is also to be very precise with all input parameters. For example, it isn't enough to set the thickness to just 6cm or so but to take into account the refraction due to the inclination and the hence extended beam path.

KAGRA MIR (Absorption)
Print this report.
MarcEisenmann - 12:17, Wednesday 10 November 2021 (2732)Get code to link to this report
absorption measurement of shinkosha evaluation plates 10 , 11 , 14

Katsuki, Marc

 

We measured first the surface calibration R_surf = 17.13 /W with z = 42.75 mm, Ziu = 66 mm and Pin = 24.2mW.

Then we measured bulk calibration R_bulk = 0.7474 cm/W with z = 41.85 mm, zIU = 65.68 mm, Pin = 23 mW and Pt = 11.8 mW.

We installed the evaluation plate 14 and found X_center = 397.5 mm, Y_center = 112.469 mm.

We increased the power to ~1W and could clearly see the 2 surfaces from Z_scan which gave Z_center = 53.875 mm.

We measured evaluation plate 14 absorption with Pin = 1.153W and Pt = 0.985W (fig 1).

The map is 70 mm radius and 1mm step size and lasted ~5h30.

We installed the evaluation plate 11 and confirmed the same Z_center position with a Z scan. Absorption measurement (fig 2) was performed with Pin = 1.169W and Pt = 1.004W.

Finally we installed the evaluation plate 10, confirmed the same Z_center and measured absorption (fig 3) with Pin = 1.153W and Pt = 0.989 W.

 

All evaluation plate were installed with marking of ingot position on the right side (looking from the injection) so that the top side of the ingot faces the injection.

 

All plates show quite high absorption with the usual star pattern.

Images attached to this report
2732_20211116081603_absorption14.png 2732_20211116081608_absorption11.png 2732_20211116081614_absorption10.png
KAGRA MIR (Polarization)
Print this report.
MarcEisenmann - 23:10, Tuesday 09 November 2021 (2731)Get code to link to this report
TAMA 1 (Shinkosha) birefringence measurement

This entry reports the birefringence measurement of TAMA #1 with 1.5cm radius, 0.25 mm step size, 0.5s wait time and 0.488mW input power.

Due to time constraints only 3 measurements were possible.

Note that the AC and DC was realigned before input polarization calibration and with sample and that here 0 deg polarization angle corresponds to s polarization.

The analysis code was checked using the Shinkosha7 data and produced identical results.

The main result is that polarization, theta and delta_n are quite uniform but the main variation corresponds also to the maximum absorption (see entries 2723 or 2672) while the triangular patterns does not seem to affect significantly these parameters.

Images attached to this report
2731_20211109150808_xsi0deg.png 2731_20211109150815_xsi30deg.png 2731_20211109150823_xsi60deg.png 2731_20211109150831_s0.png 2731_20211109150845_s1.png 2731_20211109150852_meandntheta.png 2731_20211109150858_deltan.png 2731_20211109150906_theta.png
Comments related to this report
SimonZeidler - 16:57, Wednesday 10 November 2021 (2733)

That looks very good, indeed!
What you can do in addition is to check for the second (negative) solution according to theory, as I reported last meeting.

An important point is also to be very precise with all input parameters. For example, it isn't enough to set the thickness to just 6cm or so but to take into account the refraction due to the inclination and the hence extended beam path.

R&D (FilterCavity)
Print this report.
YuhangZhao - 21:19, Monday 08 November 2021 (2730)Get code to link to this report
BS mirror magnet replacement (2)

Matteo, Takahashi-san, Yuhang

Takahashi-san removed the jig and released BS earthquake stop this morning. Before closing vacuum chamber, we checked transfer function of BS and pitch/yaw coupling.

The transfer funtion shows in the first attached figure. We can see that the red line is close to reference below about 10 Hz. The deviation at low frequency is probably due to the air flow, while the deviation at high frequency is presumably due to acoustic coupling.

The pit/yaw coupling shows in the second attached figure. The green shows the coupling when we have magnet drop. The red curve is after we put new BS magnet, which got close to reference (blue curve). This figure shows that the BS mirror magnet replacement work is successful.

After confirming TF and coupling, we closed both PR and BS chamber and evacuated them. Now, we are using turbo pump to evacuate. Until the vacuum level reaches about 1e-8 mbar, we will open the gate valve between PR/BS and Input.

Images attached to this report
2730_20211108132052_20211108bsytfinair.png 2730_20211108132057_20211108bscouplinginair.png
R&D (FilterCavity)
Print this report.
YuhangZhao - 20:55, Monday 08 November 2021 (2729)Get code to link to this report
In-vacuum Faraday measurement (2)

Matteo and Yuhang

To check what is the rotation angle of the Faraday rotator, we removed the HWP after it. We found the 2nd PBS reflected IR power decreased from 458uW to 192uW after removing HWP. This tells us that the rotation is arctan((458-192)/192) = 54 degree.

By adjusting the relative position between magnet and TGG crystal, we achieved reflection 213uW and transmission 226uW. In this case, the rotation is arctan(226/213) = 47 degree.

We put back HWP after optimizing HWP and found a transmission of 6uW from the 2nd PBS. After rotating HWP, we reduced it to 4uW.

In the end, we checked round trip loss of Faraday isolator using a IR HR mirror reflecting back the reflection from dichroic mirror. We found injection of 449uW, 2nd PBS reflection of 438uW, and total reflection of 390uW. The round trip losses from Faraday isolator is 11% now.

KAGRA MIR (Polarization)
Print this report.
MarcEisenmann - 17:24, Monday 08 November 2021 (2728)Get code to link to this report
check of the setup

We found out that the TAMA 1 fast axis orientation was also quite uniform and similar to the aztec sample...

Following entries will report all measurements that were taken but here we report the various checked performed :

 

- with 14.7 mW input power and OD 2 the maximal power reaching the QPD was below 0.6 mW (maximum recommended by Thorlabs)

- the output voltage of the QPD with this optical power is about 1.4 V (consistent with the responisitivty of the QPD at 1064 nm)

- to avoid saturation of the lockin amplifier (at 1V) we placed 6dB attenuator and the lockin voltage was indeed divided by 2

- the spectrum of the signal show clearly the peak at the chopper frequency and harmonics (note that 3rd harmonic is stronger than 2nd)

- the beams alignment before the QPDs were tuned to always be inside the sensor with and without sample

- the 2 QPDs signals have the expected behavior when changing the input beam polarization angle

- the maximum of the QPDs with sample correspond to about 0.9 of the maximum without sample (consistent with sample reflectivity checked with power meter)

 

- for the last measurement (will be precised in the entry) we reduced the incident power to 0.588 mW, removed the OD and the laser linewidth to avoid as much as possible possible back-scattering and recentered the beam with and without sample before every measurement

R&D (FilterCavity)
Print this report.
MichaelPage - 14:14, Monday 08 November 2021 (2727)Get code to link to this report
In-vacuum Faraday measurement

Yuhang, Michael

We took the opportunity to measure the vacuum FI loss when the vacuum tanks were opened, using BAB. The vacuum Faraday isolator assembly can be seen in the photo (figure 1). The polarizers are two mirrors tilted at 55 degrees (Brewster polarizers). The black tube is the Faraday rotator. Attached to the end of the rotator is the half wave plate. From the reflection of the second polarizer, the IR beam hits the dichroic mirror, where it is recombined with green. Instead of propagating to the filter cavity, we used a mirror (furthest left in the photo) to reflect the beam back through the Faraday. Then, we measured the power in the following locations:

P1 in: Incident power at the first polarizer, coming from the squeezer table
P1 ref: Reflected power after P1 in
P1 tra: Power transmitted through the first polarizer, with respect to P1 in
FR/HW tra: Power after one pass through the Faraday Rotator and Half Wave plate
P2 ref: Power reflected from the second polarizer after coming from the Faraday
P2 tra: Power transmitted through the second polarizer, with respect to FR/HW tr
Di in: Incident power on the dichroic mirror
Di ref: Reflected power from the dichroic mirror
RT P1 tra: Power transmitted through the first polarizer after two trips through the Faraday.

There is some weirdness with the power meter measuring more power after reflection from certain components, but it consistently happens in certain positions (P1 ref, P2 ref, Di ref), which makes us think it's more to do with the power meter geometry. It makes precise measurement of losses to be difficult. Still, we can draw two conclusions: 1) the polarizers have low transmission of the order of 1%, and 2) the round trip loss through the FI assembly is about 14%. We took several measurements at the positions that were causing problems. Also, the p-pol PLL unlocked at a couple of points (between columns 4/5, 10/11 on the table below)

 

Power measurement (units of uW)

  1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
P1 in 446 461   400 424 439 422 412         429 425 417 415
P1 ref 448 434 437                   427 427 428 426
P1 tra 4 4                            
FR/HW tra 447 443 430                   407 407 395 415
P2 ref 432 440   330 413               416 404 415 412
P2 tra 3 2                            
Di in                 415 395 419 422        
Di ref                 392 400 422 419 412 412 407 413
RT P1 tra           377 371 353         355 352 357 372

 

Avg. RT P1 tra/P1 in = 0.857
RT P2 transmission = 2 uW

Images attached to this report
2727_20211108053432_399a3366.jpg
Comments related to this report
MichaelPage - 14:15, Monday 15 November 2021 (2736)

I only just remembered this but we also measured the beam height (70mm) before and after the Faraday assembly, as shown in the photos.

R&D (FilterCavity)
Print this report.
MichaelPage - 13:22, Monday 08 November 2021 (2726)Get code to link to this report
BS mirror magnet replacement

Takahashi R., Matteo, Marc, Yuhang, Michael

The BS chamber was opened and the magnet was glued.

Photos of the process are attached.

The BS vacuum tank was closed on Friday, and then the PR chamber was opened and the portable cover moved over PR.

Images attached to this report
2726_20211108051809_dsc00542copy.jpg 2726_20211108051827_dsc00570copy.jpg 2726_20211108052002_dsc00571copy.jpg 2726_20211108052018_dsc00572copy.jpg 2726_20211108052032_dsc00573copy.jpg 2726_20211108052047_dsc00574copy.jpg 2726_20211108052103_dsc00579copy.jpg 2726_20211108052117_dsc00580copy.jpg 2726_20211108052125_dsc00581copy.jpg 2726_20211108052141_dsc00587copy.jpg
KAGRA MIR (General)
Print this report.
MarcEisenmann - 17:37, Tuesday 26 October 2021 (2725)Get code to link to this report
Modifications and realignment of birefringence readout

Katsuki-san, Marc

We removed all the readout of the birefringence. The reason being that the photodetectors size was quite small wrt to the beam size. This means that performing the alignment without sample might not be so accurate for the case with sample.

First we replaced the optical breadboard from imperial holes size to metric ones.

Then we reinstalled the PBS, the ODs and tried to installed the new PSD (PDQ80A) that have quite larger sensor size but are also sensitive to visible light.

In order to have a larger beam on the PSD, we replaced the lens in front of the PBS by a 100 mm focal one.

Sadly, because the PSD sensor is 4 cm above the screwing hole, it was quite tricky to find proper post.

Therefore, we also installed 2 steering mirrors just after the ODs.

Finally, we installed laserline filters right in front of the PSDs.

We took time to put label on various cables.

The alignment was checked (ie we confirmed that the maximal power of both ac and dc is reached without sample).

I just started birefringence measurement of the TAMA T1 sample with s polarization at the input.

The 'bad news' is that the gain of the PSD requires to change the gain of both lockin amplifiers depending on the input polarizations.

R&D (FilterCavity)
Print this report.
MichaelPage - 16:36, Monday 25 October 2021 (2724)Get code to link to this report
OPO replacement - incoupling mirror

Yuhang and Michael

 

When we went to place the incoupling mirror, we found that the screw threads for adjusting the incoupling mirror position were mismatched - the screw threads on components 1 and 28 (assiemepdopov3asm.pdf) have 1mm pitch while the micro adjuster screw has much smaller thread pitch. It will take some time to have the proper components ready.

Images attached to this report
2724_20211025093019_inputcouplerthreads.jpg 2724_20211025093023_microadjusterthreads.jpg
Non-image files attached to this report
KAGRA MIR (Absorption)
Print this report.
MarcEisenmann - 21:17, Friday 22 October 2021 (2723)Get code to link to this report
TAMA T1 absorption measurement

This sample absorption has been remeasured as there was some discrepancy with measurement few years old.

This one agrees with the one I did few months ago : absorption is around 18 ppm

(Pin = 7.316W, Pt = 6.29W, R = 0.8342 ppm/cm)

There are however strange patterns on the XZ YZ measurements that were not present before.

Images attached to this report
2723_20211022141708_xy.png 2723_20211022141711_xz.png 2723_20211022141714_yz.png
R&D (FilterCavity)
Print this report.
RyutaroTakahashi - 17:06, Thursday 21 October 2021 (2722)Get code to link to this report
Comment to Filter cavity BS mirror is found to have some problems (Click here to view original report: 2712)

We started evacuation of the BS chamber yesterday. I opened the gate valve between BS and NM2 today.

KAGRA MIR (General)
Print this report.
MarcEisenmann - 18:49, Wednesday 20 October 2021 (2721)Get code to link to this report
Comment to aztec polarization angle as a function of input polarization angle (Click here to view original report: 2716)

Fitting this data with a cosine gives input polarization equal to output sample polarization for angle about 41.34 deg and the phase about -6.5 deg

R&D (FilterCavity)
Print this report.
YuhangZhao - 16:29, Wednesday 20 October 2021 (2720)Get code to link to this report
Comment to Filter cavity BS mirror is found to have some problems (Click here to view original report: 2712)

Marc, Matteo, Takahashi-san, Yuhang

We opened BS chamber today to check if there is any issue for the magnet.

We found one magnet falls down as shows in the attached figure.

Takahashi-san will help us prepare a replacement magnet. The replacement work will be done in the next next week.

Images attached to this comment
2720_20211020092948_wechatimg148.jpeg
R&D (FilterCavity)
Print this report.
YuhangZhao - 11:54, Wednesday 20 October 2021 (2719)Get code to link to this report
Comment to Filter cavity BS mirror is found to have some problems (Click here to view original report: 2712)

We have done some more check before opening the BS vacuum chamber.

1. Check BS P and Y transfer functions. They are similar with reference as shows in the fig1 and fig2.

2. Check coupling between P and Y. A substantial coupling increase is found as shows in the fig3.

3. We tried to close BS local control loop. But failed.

The results of test 2 and 3 make us really need to open BS chamber to check. The opening work is scheduled to be in this afternoon.

Images attached to this comment
2719_20211020045400_bsptf20211020.png 2719_20211020045405_bstf20211020.png 2719_20211020045411_bscoupling20211020.png
KAGRA MIR (Absorption)
Print this report.
MarcEisenmann - 20:57, Tuesday 19 October 2021 (2718)Get code to link to this report
TAMA T1 absorption measurement started

Today I tried to tweak the input pump power and did several long Z scan to find the 2 surfaces of the sample.

Because it did not succeed at first, I reinstalled the bulk reference sample and got R_bulk = 0.8342 cm/W

Finally, by taking 10 averages and mean I could see the surfaces and started the measurement at Z_center = 62.75 mm

Using the value of this long Z scan the absorption is consistent with the previous measurement :

AC ~ 1.5e-4V

DC~4V

Ptrans = 6.290W

Pinc = 7.315W

gives absorption ~ 22 ppm/cm

Measurement is on-going with 0.5mm step size and 30 mm radius.

Do not touch the sample this week !