R&D (Cryogenic)
Print this report.
RishabhBajpai - 08:18, Thursday 18 July 2024 (3653)Get code to link to this report
Prerpration for setting up blackout curtain

I will set up blackout curtain near the cryostat optical table to section off the back side of ATC lab (figure-1). The plan is to move the long Al bar closer to the AC unit and hang the curtain on the entire length of the rod (figure-2). I measured various dimensions for this work.

During this work, I noticed the items on the optical table were moved. If you move stuff on the table, an email or verbal confrimation would be appericated.

Images attached to this report
3653_20240718011248_1.jpg 3653_20240718011320_2.jpg
Comments related to this report
RishabhBajpai - 08:10, Wednesday 24 July 2024 (3671)

Hirata gave me some drill bits yesterday. Unfortuantely. these drill bits are too small. If I can't find one in ATC I will order them online. If some has HEX5 bits for Makita drill, similar to the bit in the attached picture please let me know.